Current transformers application
          Make before break test principle - With 2x4 poles test plug


          Applications
          • Measurement on CT’s
          • Injection
          • Equipment replacement



          1. Normal service                                      2. Preparation: plug and lid


















                    ®
          1.1 ESSAILEC  current        1.2 The lid is installed on the   2.1 The lid is removed.  2.2 Connect the ESSAILEC
                                                                                                            ®
          sockets allow the simul-     socket and can be sealed to                     test plug leads to the test
  3
          taneous testing opera-       prevent unauthorized ac-                        set. (For equipment change
          tions of 1 to 4 indepen-     cess. The socket circuits                       or injection, short-circuit
          dent circuits on the         are closed and signals flow                      externally the 4 test leads con-
          same socket.                 from                                            nected on the current trans-
                                       current transformers                            former side: 1-2-3-4)
                                       to the equipment to be
                                       tested.


                                                                                                            2

                                                                                                        Preparation



                                                                                                   1

                                                                                                 Normal
                                                                                                 service
          5. Back to normal service






                                                                                                            5
                                                                                                          Back to
                                                                                                          normal
                                                                                                          service






          5.1 Plug removal closes back the socket     5.2 Lid is put back in place.
          contacts and signals flow again through
          the socket.




                                      ®