Voltage transformers application
          Make before break test principle - With 2x4 poles test plug



          Applications
          • Measurement on VT’s
          • Injection
          • Equipment replacement



          1. Normal service                                      2. Preparation: plug and lid


















                    ®
          1.1 ESSAILEC  voltage sockets   1.2 The lid is installed on the   2.1 The lid is removed.  2.2 Connect the ESSAILEC  test
                                                                                                            ®
          allow the simultaneous    socket and can be sealed to                        plug leads to the test set.
          testing operations of 1 to 4 in-  prevent unauthorized ac-
          dependent circuits on the   cess. The socket circuits
          same socket.              are closed and signals flow
                                    from
                                    current transformers
  4
                                    to the equipment to be
                                    tested.


                                                                                                            2

                                                                                                        Preparation



                                                                                                   1

                                                                                                 Normal
                                                                                                 service
          5. Back to normal service






                                                                                                            5
                                                                                                          Back to
                                                                                                          normal
                                                                                                          service







          5.1 Plug removal closes back the socket    5.2 Lid is put back in place.
          contacts and signals flow again through
          the socket.