Current transformers application
Make before break test principle - With 2x4 poles test plug (4 poles short-circuited)
Applications
• Measurement on CT’s
• Injection
• Equipment replacement
1. Normal service 2. Preparation: plug and lid
®
1.1 ESSAILEC current 1.2 The lid is installed on 2.1 2.1 The lid is removed. 2.2 Connect the ESSAILEC test
®
sockets allow the The lid is removed. plug leads to the test set.
3
simultaneous testing op- equipment side (1-2-3-4). The This plug is equipped with a built-in
erations of 1 to 4 socket and can be sealed to short-circuiting on
independent circuits prevent unauthorized ac- equipment side (1-2-3-4).
on the same socket. cess. The socket circuits are
closed and signals flow from
current transformers to the
equipment to be tested.
2
Preparation
1
Normal
service
5. Back to normal service
5
Back to
normal
service
5.1 Plug removal closes back the socket 5.2 Lid is put back in place.
contacts and signals flow again through
the socket.
®