Page 34 - EPR Catalog 2015
P. 34

CT-E range
Function diagrams

       B  OFF-delay, without auxiliary voltage                         CA Impulse-ON (Interval)
          (true delay on break) CT-ARE
1                                                                                  CT-VWE, CT-MFE

The OFF-delay function without auxiliary voltage does not              The output relay energizes immediately when control sup-
require continuous control supply voltage for timing.                  ply voltage is applied and de-energizes after the selected
Applying control supply voltage, energizes the output relay.           time delay is complete. If control supply voltage is inter-
If control supply voltage is interrupted, the OFF-delay starts.        rupted before the time delay is complete, the output relay
When timing is complete, the output relay de-energizes. If             de-energizes and the time delay is reset.
control supply voltage is re-applied before the time delay is          Control input A1-Y1 has to be jumpered, when this timing
complete, the time delay is reset and the output relay remains         function is selected.
energized.
Control supply voltage must be applied for the minimum                 CT-VWE:
energizing time (200 ms), for proper operation.

          A1-A2/B1                                 2CDC 252 133 F0205        A1-A2/B1                                     2CDC 252 134 F0205
                15-18                                                              15-18
                15-16                                                              15-16

          green LED                                                          green LED
                                                                                red LED
                    t = adjusted time delay
                                                                                          t                           <t
                                                                                                                      <t
                                                                                          t = adjusted pulse time

                                                t                      CT-MFE:

                                                                                  A1-A2                                   2CDC 252 135 F0205
                                                                                  A1-Y1
                                                                                   15-18
                                                                                   15-16
                                                                             green LED
                                                                                red LED

                                                                                          t

                                                                                          t = adjusted pulse time

CB Impulse-OFF, without auxiliary voltage                              CB Impulse-OFF, with auxiliary voltage
            (True trailing edge interval) CT-AWE                                   (Trailing edge interval) CT-AWE

The Impulse-OFF function without auxiliary voltage does not            This function requires continuous control supply voltage
require continuous control supply voltage for timing.                  for timing. Timing is controlled by control input A1-Y1. If
If control supply voltage is interrupted, the output relay             the control input is opened, the output relay energizes and
energizes and the OFF time starts. When timing is complete,            timing begins. When the selected time delay is complete,
the output relay de-energizes. If control supply voltage is            the output relay de-energizes. Interrupting control supply
re-applied before the time delay is complete, the time delay is        voltage or closing control input A1-Y1, before the time delay
reset and the output relay de-energizes.                               is complete, de-energizes the output relay and resets the time
Control supply voltage must be applied for the minimum                 delay.
energizing time (200 ms), for proper operation.

               A1-A2                         t     2CDC 252 138 F0205             A1-A2
                15-18                                                                                                                                                                                                             2CDC 252 137 F0205A1-Y1
                15-16                                                              15-18
          green LED                                                                15-16
             red LED                                                         green LED
                                                                                red LED
                    t = adjusted pulse time
                                                                                                                   t

                                                                                          t = adjusted pulse time

1/23 ABB | Catalog Electronic Products and Relays 2015 | 2CDC 110 004 C0210
   29   30   31   32   33   34   35   36   37   38   39